FP-924 soiling and cleaning audit
Plant FP-924 (2,952 kWp, 35 inverters, 25 blocks). Data: Solar Link daily inverter energy 3-Jul-2025 to 22-Nov-2026, 5-min power 22-Oct to 22-Nov-2026, SMP3 pyranometer, ERA5 weather, CAMS PM10. Economics year: 2025-11-23 to 2026-11-22 (measured meter energy 4,210,888 kWh).
Verdict. The current ₹3.65 lakh/yr net figure is too high: it sits at the upper bound. The 0.258 %/day rate comes from a step detector that the data do not support (output does not decay again after detected cleanings: -0.003 %/day vs −0.215 %/day expected). Best defensible estimate: ≈₹0.91 L/yr net (range ₹0 to ₹5.54 L), cleaning about every 31 dry days.
Answers at a glance
| Question | Short answer | Verdict |
|---|---|---|
| 1. Existing calculations | Equations are mostly right; the inputs are not. The 0.258 %/day rate and the 'observed' cleaning interval come from noise-driven step detection. | Overstated |
| 2. Are dust losses underestimated? | No. Sensor soiling and the campus-relative method hide some plant-wide dust, but rain tests cap it near 2.3 % after 21–42 dry days (up to 11 % in the haze-inflated bound). | Not underestimated |
| 3. Scenarios | A ₹0 · B ₹0.91 L · C ₹5.54 L net per year. | B most credible |
| 4. Optimal interval / break-even | B: clean every ~31 dry days (4 rounds/yr); pays only below ₹10.7/module. Block-specific schedule adds ≈ ₹0. | Whole-plant schedule |
| 5. Biggest driver | Dust rate (swing ₹5.17 L), then cleaning cost and the rain threshold. Monte Carlo P5–P95: ₹0.00 L to ₹3.70 L. | Rate must be measured |
| 6. Physical validity | Capacity OK except 12 logger-dump days; γ = −0.29 %/°C correct; portal 'POA' is really GHI; 27 'cleanings' are fault recoveries. | Fix data flags |
| 7. Recommendation | Present B as the headline, A–C as the range, and a 60-day measurement plan to validate C. | Honest range |
1. Audit of the existing FP-924 calculations
Each listed item was recomputed from the raw exports where the data allowed.
| Item | Finding | Tag | Verdict |
|---|---|---|---|
| Generation / inverter data | Last 365 d: 4,210,888 kWh meter (1426.4 kWh/kWp); meter ÷ inverters = 1.0064. 12 inverter-days exceed 7.2 kWh/kWp (max 9.99) = logger catch-up dumps, not real. | Measured | Flag & drop dumps (not done in Solpop) |
| DC / AC capacity | 2952.2 kWp / 2479.89 kW (ratio 1.19); ≈4,840 modules (portal field blank). | Measured / calculated | OK |
| POA irradiance & weather | Portal 'POA' tracks GHI (horizontal sensor). Tilt/azimuth not recorded (assumed 20°/10°/7°, south). Sensor ratio to ERA5 jumps 0.758 → 0.971 on 11-Nov-2026 (sensor dirt or rescale). | Measured | Sensor itself soils; masks dust in PI |
| Expected energy | Isotropic POA × NOCT × 0.96 is acceptable. Clipping ignored: 16 inverters hit AC limit; 0.33 % of Oct–Nov energy at limit (worst 3.6 %). | Calculated | Minor |
| Module temperature | γ = −0.29 %/°C and NOCT 43 °C match Trina datasheet. Module-temperature sensor reads NaN, so NOCT is unvalidated. | Assumed | OK (small effect) |
| Performance Index | Clear-day plant PI swings 0.78 (winter) → 0.96 (summer). 43 mm of rain restored only 2.3 %, so this swing is shading/sun-angle/fog, not dust. | Calculated | Do not call it soiling |
| Soiling Ratio | SR = PI ÷ post-rain (≥8 mm) PI. Reasonable, but the reference inherits sensor dirt and partial rain cleaning. | Calculated | Acceptable as relative |
| Daily soiling rate | 0.258 %/day = median step ÷ days. After detected cleanings the block output stays flat (-0.003 %/day, 95 % CI -0.021 to +0.017). | Inferred | Not supported |
| Cleaning-event identification | 169 events confirmed; threshold 3.5 % ≈ 1.5× daily noise (2.3 %). Pure noise alone yields 35 events; lowering threshold to 2 % gives 551. 27 events follow a fault 'drop'. | Inferred | Not a cleaning log |
| Interval optimisation | T* = √(2C/(pEr)) is correct for linear dust, but E was a November forecast (≈9,200 kWh/d) not the annual mean (11,537 kWh/d), and the 'observed' interval (17–118 d by block) comes from the same unreliable events. | Calculated | Formula OK, inputs not |
| Tariff & cleaning cost | ₹7.75/kWh and ₹6/module are assumptions (no bill or crew cost data). | Assumed | Test in sensitivity |
Red flags verified
| Claim | Recomputed | Status |
|---|---|---|
| Detected crew cleanings | 169 (2025-11-12 – 2026-11-21) | Confirmed |
| Min / median step | 3.5 % / 5.9 % | Confirmed |
| Step vs days-since-reset, r | 0.035 (p = 0.71) | Confirmed |
| LOO error: constant vs linear | 1.83 vs 3.89 pts | Confirmed |
| 'Drop' events | 52; 27 cleanings come ≤30 d after a drop | Faults mixed with dust |
Artefact or plateau? Neither explanation in the brief fits. A synthetic test (hypothetical series, real noise) shows the detector gives r ≈ 0.09 even when dust is truly linear, and over-states a true 0.258 %/day as 0.48 %/day. The low correlation is a detection artefact, but it pushes the rate up, not down.
2. Are dust losses underestimated?
Short answer: no. Two mechanisms do hide dust, but the rain experiments bound the hidden part.
| Possibility | Answer | Evidence |
|---|---|---|
| Seasonal variation | Partly | PM10 peaks Apr–Jun and Oct–Nov; a season-specific rate model does not beat the campus model out of sample (3.88 vs 3.89 pts). |
| Block-to-block differences | No | Block-vs-campus decay after cleanings is ≤ 0.02 %/day; block-specific rate model is worse (5.30 pts). Block offsets (H Block, TSLAS, Carport) are shading. |
| Particulate / local conditions | Partly | CAMS dust is high in Oct–Nov, but haze lowers sunlight, not module transmittance; the dust-flux model lost in Solpop's own LOO. |
| Long dry periods | Yes (handled) | Oct–Jan has ~100 dry days; this is where cleaning pays. The day-by-day simulation uses the real rain calendar. |
| Non-uniform accumulation | Unknown | Bottom-edge dust on 7–10° carport/shed roofs could add mismatch loss; needs string-current or IV data. |
| Dry vs wet (cemented) soiling | No evidence | 43 mm of rain after the foggy winter restored only 2.3 % (pyranometer) – no large cemented layer. |
| Single campus-wide rate | No | Block differences are below detection; one rate is adequate. |
| Clean-reference effect | Yes, small | A dirty pyranometer/post-rain reference hides plant-wide dust. Bounded by ERA5: up to 11 % (Jan) / 9 % (Mar), but ~8 pts of that is sky clearing/sensor wash. |
| Rain day | mm | Dry days before | Jump vs pyranometer | Jump vs ERA5 | Sky/sensor change |
|---|---|---|---|---|---|
| 2026-01-23 | 43.5 | 21 | +2.3 % | +11.1 % | +7.6 % |
| 2026-03-16 | 6.5 | 42 | +2.2 % | +9.0 % | +7.1 % |
| 2026-04-29 | 3.4 | 20 | -1.0 % | -1.0 % | +0.5 % |
| 2026-05-30 | 21.4 | 17 | -0.1 % | +4.0 % | +4.0 % |
Other losses that cleaning cannot recover: inverter/logger downtime (2.1 % of inverter-days, ≈90,267 kWh in Feb–Nov 2026 – more than scenario B recovers) and winter shading/sun-angle loss.
3. Scenarios A / B / C
A = only what the pyranometer rain test proves; B = most likely; C = the existing model's rate, with no saturation and 100 % cleaning recovery.
| Scen. | Daily soiling rate | Annual dust loss, rain only | Recoverable by cleaning | Interval | Cleanings/yr | Gross value | Cleaning cost | Net savings | Rate tag |
|---|---|---|---|---|---|---|---|---|---|
| A | 0.050 %/d (saturating 3 %) | 27,936 kWh (0.66 %) | 0 kWh | no routine cleaning | 0 | ₹0 | ₹0 | ₹0 | I/As |
| B | 0.100 %/d | 72,391 kWh (1.72 %) | 26,732 kWh | 31 d | 4 | ₹2,07,171 | ₹1,16,160 | ₹91,011 | I/As |
| C | 0.258 %/d | 188,655 kWh (4.48 %) | 116,417 kWh | 16 d | 12 | ₹9,02,231 | ₹3,48,480 | ₹5,53,751 | H |
| Input | A conservative | B realistic | C upper bound |
|---|---|---|---|
| Rate basis | 2.2 % ÷ 42 d (Mar rain, pyranometer) | 2.3 % ÷ 21 d (Jan rain, pyranometer) | Existing 0.258 %/d; ≈ ERA5 bound of Mar rain (9 % ÷ 42 d) |
| Share removed by a cleaning | 90 % (As) | 95 % (As) | 100 % (H) |
| Clipping factor on recovery | 0.97 (As) | 0.99 (Ca, 5-min data) | 1.00 (H) |
| Rain wash | ≥5 mm removes 90 % (I: 3.4 mm did nothing, 6.5 mm did) | same | same |
| Energy E | 4,210,888 kWh measured meter (M) | same | same |
| Tariff / cost | ₹7.75/kWh, ₹6/module × 4,840 = ₹29,040 per round (As) | same | same |
Tags: M measured · Ca calculated · I inferred · As assumed · H hypothetical. Loss, recoverable energy, rupees and interval are all calculated from these inputs.
4. Financial optimisation
Net = value of recovered energy − cleaning cost, against a rain-only baseline. B peaks broadly between ~22 and 35 days; below ~15 days every scenario except C loses money.
| Scen. | Best interval (simulated) | T* = √(2C/pEr) | Break-even cost per module | Whole plant, one interval | Block-specific intervals |
|---|---|---|---|---|---|
| A | none | 39 d | ₹3.2 | ₹0 | ₹0 |
| B | 31 d | 26 d | ₹10.7 | ₹90,987 | ₹90,987 |
| C | 16 d | 16 d | ₹29.4 | ₹5,53,679 | ₹5,54,859 |
Block-specific scheduling adds almost nothing: no block soils measurably faster, and kWh per module differs only 691–977 kWh/yr (Carport lowest).
Net savings (scenario B) vs tariff and cleaning cost, ₹/yr
| Tariff \ cost per module | ₹3 | ₹4 | ₹5 | ₹6 | ₹8 | ₹10 | ₹12 |
|---|---|---|---|---|---|---|---|
| ₹5.0 | ₹76,000 | ₹56,000 | ₹37,000 | ₹17,000 | ₹0 | ₹0 | ₹0 |
| ₹6.0 | ₹1,04,000 | ₹83,000 | ₹64,000 | ₹44,000 | ₹6,000 | ₹0 | ₹0 |
| ₹7.0 | ₹1,38,000 | ₹1,10,000 | ₹90,000 | ₹71,000 | ₹32,000 | ₹0 | ₹0 |
| ₹7.75 | ₹1,64,000 | ₹1,31,000 | ₹1,10,000 | ₹91,000 | ₹52,000 | ₹14,000 | ₹0 |
| ₹8.0 | ₹1,72,000 | ₹1,39,000 | ₹1,17,000 | ₹98,000 | ₹59,000 | ₹20,000 | ₹0 |
| ₹9.0 | ₹2,07,000 | ₹1,73,000 | ₹1,44,000 | ₹1,24,000 | ₹86,000 | ₹47,000 | ₹8,000 |
| ₹10.0 | ₹2,47,000 | ₹2,07,000 | ₹1,73,000 | ₹1,51,000 | ₹1,12,000 | ₹74,000 | ₹35,000 |
Like-for-like with the existing headline (incremental over an assumed current practice)
| Scen. | Current interval (assumed) | Proposed | Extra kWh | Extra value | Extra cost | Extra net |
|---|---|---|---|---|---|---|
| A | 30 d | 61 d | -8,379 kWh | ₹-64,934 | ₹-1,45,200 | ₹80,266 |
| A | 45 d | 61 d | -4,049 kWh | ₹-31,382 | ₹-87,120 | ₹55,738 |
| A | 60 d | 61 d | -284 kWh | ₹-2,203 | ₹-29,040 | ₹26,837 |
| B | 30 d | 31 d | -979 kWh | ₹-7,584 | ₹-29,040 | ₹21,456 |
| B | 45 d | 31 d | 12,791 kWh | ₹99,127 | ₹29,040 | ₹70,087 |
| B | 60 d | 31 d | 25,627 kWh | ₹1,98,607 | ₹87,120 | ₹1,11,487 |
| C | 30 d | 16 d | 40,489 kWh | ₹3,13,791 | ₹2,03,280 | ₹1,10,511 |
| C | 45 d | 16 d | 78,178 kWh | ₹6,05,878 | ₹2,61,360 | ₹3,44,518 |
| C | 60 d | 16 d | 113,386 kWh | ₹8,78,738 | ₹3,19,440 | ₹5,59,298 |
The existing ₹3.65 L matches scenario C against a 45-day practice (₹3,44,518). It is an upper-bound number.
5. Sensitivity and uncertainty
The dust rate dominates everything; cleaning cost, rain threshold and tariff come next. Availability barely matters.
| Variable (low / high) | Net at low | Net at high |
|---|---|---|
| Soiling rate r (0.05 / 0.258 %/day) | ₹0 | ₹5,16,873 |
| Cleaning cost (Rs 12 / 3 per module) | ₹0 | ₹1,69,744 |
| Rain needed to wash (3 mm / 10 mm) | ₹32,474 | ₹1,70,545 |
| Electricity value (Rs 5 / 10 per kWh) | ₹17,498 | ₹1,52,858 |
| Dust saturates at 3 % (yes / no) | ₹0 | ₹91,011 |
| Interval fixed at 15 / 62 days (optimum 31) | ₹-57,552 | ₹0 |
| Share of dust a cleaning removes (80 % / 100 %) | ₹58,380 | ₹1,01,881 |
| Plant availability (95 % / 100 %) | ₹80,652 | ₹91,011 |
Monte Carlo (1500 runs over the stated ranges: rate 0.04–0.26 %/d log-uniform, tariff ₹6–9, cost ₹4–10, removal 85–100 %, availability 96–100 %, clipping 0.97–1): median ₹0.69 L, P5 ₹0.00 L, P95 ₹3.70 L; 27 % of runs say routine cleaning does not pay. Bootstrap over rain events is not used (n = 2 informative events).
Bootstrap over the 113 detected intervals gives 0.258 %/d (95 % CI 0.214–0.313), but this only measures scatter of a biased estimator, so it is not used.
6. Physical and engineering validity
| Check | Passes? | Note |
|---|---|---|
| Energy within installed capacity | Mostly | 12 inverter-days and 1 plant-day exceed physical limits (logger dumps, max 9.99 kWh/kWp). |
| Temperature coefficient | Yes | −0.29 %/°C (datasheet). The portal's '−0.0003' field is wrong. |
| Irradiance units consistent | Partly | Units fine (W/m², kWh/m²). Channel labelled POA is horizontal GHI; tilt not recorded. |
| No double-counting of soiling | No | 27 'cleanings' are recoveries from fault drops, counted as dust. |
| PR, PI, SR, efficiency kept apart | Partly | Portal PR = yield ÷ GHI (not POA), so it hits 100–118 % on 3–10 Nov 2026. PI, SR and module efficiency are separate in this audit. |
| Cleaning cannot recover faults/downtime | Fixed here | Audit uses measured meter energy (downtime already excluded) and a removal factor below 100 %. |
7. Deliverables
7.1 Audit
See sections 1 and 6.
7.2 Corrected equations (only where a number changes)
7.3–7.5 Scenario comparison, loss/savings table, graphs
Section 3 table; figures in sections 4–5.
7.6 Most influential assumptions
| Rank | Assumption | Swing in B net |
|---|---|---|
| 1 | Soiling rate r (0.05 / 0.258 %/day) | ₹5.17 L |
| 2 | Cleaning cost (Rs 12 / 3 per module) | ₹1.70 L |
| 3 | Rain needed to wash (3 mm / 10 mm) | ₹1.38 L |
| 4 | Electricity value (Rs 5 / 10 per kWh) | ₹1.35 L |
| 5 | Dust saturates at 3 % (yes / no) | ₹0.91 L |
7.7 Data needed to validate scenario C
| Data | Why | How |
|---|---|---|
| Crew cleaning log (date, block, modules, water, ₹) | Replaces detected events; gives true interval and cost | From O&M team / Solar Ladder |
| Clean vs dirty reference pair on 2–3 roofs (one module cleaned daily) | Direct soiling rate, incl. saturation | 60+ dry days, Oct–Jan and Mar–Jun |
| Pyranometer cleaning log + tilted reference cell | Removes sensor-dirt masking | Clean sensor daily during test |
| String/MPPT current before and after a cleaning | Measured step per block | 5-min data, 3 days each side |
| Tilt, azimuth, string layout per block | Correct transposition and shading | Site survey |
| Inverter alarm/event log | Separates faults from dust | Portal has none; ask vendor |
| Actual cost per module and avoided tariff | Economics | Crew invoices, PSPCL bill |
7.8 Recommendation for the presentation
- Headline: scenario B, ≈₹0.91 L/yr net, cleaning ~every 31 dry days (4 rounds/yr); show A–C as the range (₹0 to ₹5.54 L).
- Say plainly that the earlier ₹3.65 L rests on a rate the data do not confirm; it is the upper bound.
- Point out the bigger recoverable loss is downtime (≈90,267 kWh in Feb–Nov 2026), not dust.
- Close with the measurement plan in 7.7: it turns the range into a measured number.
Appendix
A1. Detector test (synthetic series are hypothetical, built from each block's real noise)
| Series | Cleanings found | Median step | Median rate %/d | r(step, days) | Slope after cleaning %/d |
|---|---|---|---|---|---|
| Real data (Solpop events) | 169 | 5.9 % | 0.258 | 0.03 | -0.003 |
| Real data (our re-run) | 221 | 6.4 % | 0.351 | 0.07 | – |
| No dust, noise only | 35 | 8.3 % | 0.404 | 0.04 | -0.001 |
| Linear dust 0.258 %/d + real cleanings | 177 | 8.8 % | 0.482 | 0.09 | -0.215 |
Reading: linear dust would leave a clear −0.2 %/day slope after each cleaning; the real data show none. The step-vs-gap correlation is near zero in every case, so it cannot decide between linear and saturating dust.
A2. Out-of-sample error of step models (on the 113 Solpop intervals, % points)
| Model | Scope | Leave-one-out | Leave-one-block-out |
|---|---|---|---|
| constant | block | 1.66 | – |
| constant | campus | 1.83 | 1.84 |
| constant | season | 1.80 | 1.83 |
| linear | block | 5.30 | – |
| linear | campus | 3.89 | 3.91 |
| linear | season | 3.88 | 3.89 |
| linear+intercept | block | 2.07 | – |
| linear+intercept | campus | 1.84 | 1.85 |
| linear+intercept | season | 1.82 | 1.85 |
| saturating | block | 2.11 | – |
| saturating | campus | 1.99 | 2.01 |
| saturating | season | 1.99 | 2.02 |
Constant (1.83) ≈ linear+intercept (1.84) < saturating (1.99) < linear (3.89). A constant step wins because the steps are mostly threshold + noise, not because dust plateaus.
A3. Dry-window trends (clear days)
| Window | Reference | Days | Slope %/d | 95 % CI |
|---|---|---|---|---|
| 2025-12-01 to 2026-01-21 | pyranometer | 32 | +0.150 | +0.026 to +0.346 |
| 2025-12-01 to 2026-01-21 | ERA5 | 34 | -0.240 | -0.470 to -0.025 |
| 2026-01-25 to 2026-03-15 | pyranometer | 39 | +0.183 | +0.120 to +0.252 |
| 2026-01-25 to 2026-03-15 | ERA5 | 39 | -0.011 | -0.146 to +0.112 |
| 2026-03-20 to 2026-05-29 | pyranometer | 49 | +0.022 | -0.021 to +0.055 |
| 2026-03-20 to 2026-05-29 | ERA5 | 49 | +0.099 | +0.037 to +0.170 |
| 2026-10-12 to 2026-11-10 | pyranometer | 21 | +0.763 | +0.220 to +1.129 |
| 2026-10-12 to 2026-11-10 | ERA5 | 28 | -0.932 | -1.146 to -0.688 |
Slopes are dominated by the seasonal geometry curve and by smoke haze (ERA5, Oct–Nov), so they are not used as soiling rates.
A4. Method notes
- Inverter columns matched by position (portal repeats 'Inverter8', 'Inverter9').
_corrected5-min file used for 1-Nov; '(1)' duplicates skipped. - Quality flags per inverter-day: missing/zero, logger dump (>7.2 kWh/kWp and the day before), cloudy (expected <1.5 kWh/kWp), outage (<50 % of campus median).
- Expected energy: ERA5 hourly GHI/DNI/DHI, isotropic transposition, NOCT cell temperature, γ = −0.29 %/°C, DC derate 0.97, inverter 97.5 %, clipped at AC rating.
- Economics: day-by-day over 23-Nov-2025 to 22-Nov-2026 with real ERA5 rain; policy = clean when T days have passed since the last cleaning or ≥5 mm rain.
- Block files
thapar_panels.csvandthapar_block_sensors_hourly.csvcontain modelled per-panel and sensor values (no such measurements exist in the portal); they were not used. - Re-run everything:
audit/.venv/bin/python audit/scripts/run_all.py.